Please use this identifier to cite or link to this item: http://hdl.handle.net/1893/3086
Appears in Collections:Management, Work and Organisation Conference Papers and Proceedings
Peer Review Status: Refereed
Author(s): Bakhtavar, Ezzeddin
Oraee, Kazem
Shahriar, Kourosh
Contact Email: sko1@stir.ac.uk
Title: Determination of the Optimum Crown Pillar Thickness Between Open Pit and Block Caving
Citation: Bakhtavar E, Oraee K & Shahriar K (2010) Determination of the Optimum Crown Pillar Thickness Between Open Pit and Block Caving. In: Proceedings: 29th International Conference on Ground Control in Mining. ICGCM Papers. 29th International Conference on Ground Control in Mining, Morgantown, West Virginia, USA, 27.07.2010-29.07.2010. Morgantown, West Virginia: Dept. of Mining Engineering, College of Engineering and Mineral Resources, West Virginia University, pp. 325-332. http://icgcm.conferenceacademy.com/papers/detail.aspx?subdomain=icgcm&iid=309
Issue Date: 2010
Date Deposited: 14-Jun-2011
Series/Report no.: ICGCM Papers
Conference Name: 29th International Conference on Ground Control in Mining
Conference Dates: 2010-07-27 - 2010-07-29
Conference Location: Morgantown, West Virginia, USA
Abstract: In this paper, a relationship between dependant parameters and the crown pillar thickness is first introduced. This relationship defines geotechnical problems caused by thin pillars and economic considerations created by pillars that are thicker than the optimum size. For this purpose, a dimensional analysis as an effective physico-mathematical tool was used. This technique restructures the original dimensional variables of a problem into a set of dimensionless products using the constraints imposed upon them by their dimensions. A model is hence introduced that calculates the optimum pillar thickness. The relationship introduced here and the method applied can be used by mining engineers in all situations where a combined open-pit and block caving method is deemed to be the most appropriate mining method.
Status: VoR - Version of Record
Rights: The ICGCM president has granted permission for use of ICGCM conference papers in this Repository. The paper was first published in the proceedings of 29th International Conference on Ground Control in Mining by Morgantown, W. VA : Dept. of Mining Engineering, College of Engineering and Mineral Resources, West Virginia University. The full text of the final version of this paper is available from the conference website: http://icgcm.conferenceacademy.com/papers/detail.aspx?subdomain=icgcm&iid=309
URL: http://icgcm.conferenceacademy.com/papers/detail.aspx?subdomain=icgcm&iid=309

Files in This Item:
File Description SizeFormat 
Determination of the Optimum Crown Pillar Thickness Between Open.pdfFulltext - Published Version871.21 kBAdobe PDFView/Open



This item is protected by original copyright



Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/

If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.